After a last-minute change, the load sheet must be:

A

amended or a new one prepared and the CG re-verified

Correct
B

ignored

C

kept as original

D

only verbally acknowledged

Explanation

The loadsheet must be amended to reflect the LMC and the CG must be rechecked to ensure it remains within limits.